Quality Assurance Plumbing Sheet

Plumbing QA inspection · 水工质量检查表

Form 表格
QA stage 检查阶段
Pipe work installed 管材
Drain system 排水 (choose all that apply 可多选)
Water supply system 给水 (choose all that apply 可多选)

1Checklist 检查项目

Tap ✓ when it is done, ✗ when there is a problem (say what is wrong), N/A when it does not apply to this room (add a note if useful). Answer every item on this stage. To change an answer, tap a different one. “Select all” ticks every item still empty; “Clear all” empties the whole section (tap it twice).
完成点 ✓,有问题点 ✗ 并写明原因,不适用点 N/A(可写备注)。本阶段每一项都要填。要改答案,直接点另一个选项。“全部选择”把还没填的项全部打 ✓;“全部取消”清空整段(要点两次)。

2Additional Notes 备注

3Photos 照片

4Data Check 数据检查

Updates as you fill in the sheet. Tap a line to jump to it. Red items must be fixed before you submit.
填表时自动检查,点一行可跳到该处。红色项目必须改好才能提交。

5Signature 签名

Sign to confirm you have carried out an inspection on the relevant works and checked that the information above is accurate. 核对所有信息后水工签字。

Inspector signature 签名 *

6Office Check 办公室审核 (office use 管理填写)

Your sheet saves automatically on this device, and to the office once you are signed in. One sheet is one room at one stage. After you submit, a new sheet opens with the same site, floor, stage, inspector and pipes filled in, ready for the next room.
表格自动保存在本机,登录后也会保存到办公室。一张表 = 一个房间的一个阶段。提交后会开一张新表,地址、楼层、阶段、检查人和管材都保留,接着填下一个房间。